![]() |
Bhrahmani Inland Waterway - Printable Version +- Odisha Development Forum - An Initiative from The Odisha Society of the Americas () +-- Forum: Infrastructure & Built Environment (/forum-13.html) +--- Forum: Waterways; River Basins, Water management; Irrigation (/forum-36.html) +---- Forum: NW-5 (/forum-187.html) +---- Thread: Bhrahmani Inland Waterway (/thread-520.html) |
Bhrahmani Inland Waterway - Chitta - 10-02-2023 Several news items on this on August 24th 2023: See
Quote:The Centre unveils an ambitious proposal for a Rs 120 billion inland waterway along the Brahmani river in Odisha. The objective is to facilitate the efficient movement of goods from four key industrial clusters to the ports of Paradip and Dhamra. The scheme envisions government-led infrastructure development using the engineering, procurement, and construction (EPC) model. See also RE: Bhrahmani Inland Waterway - Chitta - 04-16-2024 Following is from the 2016 act at https://www.indiacode.nic.in/bitstream/123456789/2159/1/A2016-17.pdf RE: Bhrahmani Inland Waterway - Chitta - 04-16-2024 Following is from https://www.iwai.nic.in/waterways/national-waterways/national-waterways-5?id=2527 , the official site. Salient features of National Waterway No. 5 - Brahmani river & Mahanadi delta system along with East Coast Canal (NW-5) The Talcher- Dhamra stretch of river Brahmani, Geonkhali- Charbatia stretch of East Coast Canal, Charbatia- Dhamra stretch of Matai river and Mangalgadi-Paradip stretch of Mahanadi delta rivers (NW-5, 623 km) Declared as National Waterway 5 (NW 5) on 25.11.2008 Detailed Project Report (DPR) prepared by M/s. WAPCOS Length - 588 km. River portion (371 km) Canal portion (217 km) Estimated Cost (at 2009 prices) (i) Cost for development of River portion Rs. 2230 cr (Barrages- 1843 cr) (ii) Cost of development of canal portion Rs. 1979 cr (Dredging- 1273 cr) (iii) Total Cost Rs. 4209 crore Period of Completion - 7 years Land Acquisition: in West Bengal - 846 Ha in Orissa - 1172 Ha required Estimated cost of land acquisition - Rs. 176 Crore Details of dredging River portion - 10.07 million cum Canal portion - 44.77 million cum Barrages To maintain LAD of 2 m in the Brahmani river all through the year, 5 barrages with height equal to the highest flood level are proposed to be constructed at every 26 km between Talcher and Jokadia. Each barrage will have a navigational lock to allow passage of two 500 tonne vessels at a time. Cargo potential Coal from Talcher to Dhamra and Paradip ports is the most important potential cargo for this waterway. Immediately after the development of the waterway, it is estimated in the DPR that about 11 million tonne of cargo can be transported per year which can go up to 23 million tonne in next 15 years or so. EIRR River portion 31.77% Canal portion 12.75% Rive and canal together 23.75% Phase – I activities are as follows :- Detailed Hydrographic Survey (Phase-II) from Talcher to Pankapal : 120 Km length- completed in October, 2020. Monthly Thalweg Survey (Phase–I) from Pankapal to Dhamra - Paradip via. Mangalgadi : 230 LKM per month – Monthly Thalweg Survey conducted & LAD report issued monthly basis. Consultancy for preparation of DPR including FEED for construction of 4 Weirs cum Barrages with 3 Navigation locks, 2 Check Dams & 1 Rubber Dam with Nav. Lock (Phase-I) – The DPR is likely to be completed by March, 2021. Consultancy for preparation of DER including DEDD for Modification / Reconstruction of existing Bridges on NW-5 (Phase-I) – The DPR is likely to be completed by March, 2021. EIA / EMP study between Paradip / Dhamra and Pankapal (Fairway development) (Phase-I). Shifting / Relocation of HT / LT Power lines in NW-5 (Phase-I)- The work was entrusted to Govt. of Odisha (Deposit basis). For Executive Summary of DPR Click here Mathematical Model Study Report for Brahmani River System NW5 (PDF, 9818 KB) Final DPR of NW-5 (PDF, 20658 KB) Project Development Consultancy for Development of National Waterway - 5 in PPP mode RE: Bhrahmani Inland Waterway - Chitta - 04-16-2024 The 2022 EOI on NW-5 and NW-64. See https://odishadev.odishasociety.org/attachment.php?aid=497 and https://odishadev.odishasociety.org/attachment.php?aid=499 for the pdfs. RE: Bhrahmani Inland Waterway - Chitta - 10-19-2024 Following is from https://x.com/MohanMOdisha/status/1847602079973744757 |