Roads in Bhubaneswar - Printable Version +- Odisha Development Forum - An Initiative from The Odisha Society of the Americas () +-- Forum: Greater Capital area (/forum-11.html) +--- Forum: Capital region entities/infrastructure (/forum-21.html) +---- Forum: Major Roads (/forum-362.html) +---- Thread: Roads in Bhubaneswar (/thread-684.html) |
Roads in Bhubaneswar - Chitta - 01-01-2021 Following shows the content of https://sambadepaper.com/imageview_211753_25948771_4_71_01-01-2021_15_i_1_sf.html . It has not been uploaded to this server. RE: Roads in Bhubaneswar - Chitta - 02-13-2023 As per news reports the road from Jayadev Vihar to Nanadankanan to Cuttack will become a dedicated corridor with flyovers. Following is an excerpt from https://odishabytes.com/bhubaneswar-to-have-dedicated-corridor-to-decongest-jaydev-vihar-nandankanan-road/ Quote:Bhubaneswar: Plans are afoot to develop a dedicated corridor for movement of vehicles in order to decongest the Jaydev Vihar-Nandankanan Road and Bidyut Marg in Odisha capital from heavy traffic. RE: Roads in Bhubaneswar - Chitta - 02-25-2023 As per https://sambadepaper.com/imageview_37040_186002_4_71_25-02-2023_2_i_1_sf.html the Daya West Canal will be made a 6 lane road starting from Barang all the way to Retang. See also https://odishabytes.com/works-on-6-lane-road-along-daya-west-canal-in-bhubaneswar-to-start-soon/ . Following is an excerpt from it. Quote:Barang in Cuttack and Retang in Jatni will get a direct connecting road. As a result, vehicular traffic from Cuttack-Puri road to Ravi Talkies and Jaydev Vihar to Nandankanan will come down. RE: Roads in Bhubaneswar - Chitta - 03-18-2024 As per https://sambadepaper.com/imageview_43920_186620_4_71_18-03-2024_4_i_1_sf.html the right parallel road from Acharya Vihar square to Damana square is finally open. It goes through Acharya Vihar Square, Sainik School square, Press square, MCL square, ECOR stadium square, and Kelucharan Park. See map below. RE: Roads in Bhubaneswar - Chitta - 03-18-2024 The left parallel road is stuck for the 800 meters or so that is currently aligned to pass through Salia Sahi and is facing opposition from the people of Salia Sahi. I think a better approach would be to reroute that segment along the boundary of Ekamra Kanan. See map below. |