07-21-2024, 10:48 PM
Recent updates from https://themetrorailguy.com/category/bhubaneswar-metro/ . It has a lot more details.
16th July 2024: https://themetrorailguy.com/2024/07/16/s...t-bcdd-01/
SYSTRA Wins Bhubaneswar Metro’s Detailed Design Consultant Contract BCDD-01
10th July 2024: https://themetrorailguy.com/2024/07/10/1...04-bbc-05/
11 Bidders for Bhubaneswar Metro’s Contracts BBC-04 & BBC-05
Package BBC-04
Estimated Cost: Rs. 664.06 Crore
DMRC’s Brief Scope: Part Design and Construction of Elevated Viaduct and Seven Elevated Stations viz. Jayadev Vihar Square, Xavier Square, Rail Sadan, District Centre, Damana Square, Patia Square and KIIT Square (excluding Architectural finishing) from Chainage 7747.00 to 15017.00 of Bhubaneswar Metro Phase-I MRTS
Package BBC-05
Estimated Cost: Rs. 869.71 Crore
DMRC’s Brief Scope: Part Design and Construction of Elevated Viaduct and Six Elevated Stations viz. Nandan Vihar, Raghunathpur, Nandankanan Zoological Park, Barang Station, Phulapokhari, Trisulia Square (excluding Architectural finishing) from Chainage 15017.00m to 25987.78m and including ramp for Depot entry of Bhubaneswar Metro Phase-I MRTS
Bidders
5th July 2024: https://themetrorailguy.com/2024/07/05/1...-contract/
12 Bidders for Bhubaneswar Metro Package BBC-03’s Contract
DMRC’s Brief Scope: Part Design and Construction of Elevated Viaduct and Six Elevated Stations viz. Capital Hospital, Bapuji Nagar, Bhubaneswar Railway Station, Ram Mandir Square, Vani Vihar and Acharya Vihar Square (excluding Architectural finishing ) from Chainage 625.00 m to 7747.00 m of Bhubaneswar Metro Phase-I MRTS.
Bidders
16th July 2024: https://themetrorailguy.com/2024/07/16/s...t-bcdd-01/
SYSTRA Wins Bhubaneswar Metro’s Detailed Design Consultant Contract BCDD-01
10th July 2024: https://themetrorailguy.com/2024/07/10/1...04-bbc-05/
11 Bidders for Bhubaneswar Metro’s Contracts BBC-04 & BBC-05
Package BBC-04
Estimated Cost: Rs. 664.06 Crore
DMRC’s Brief Scope: Part Design and Construction of Elevated Viaduct and Seven Elevated Stations viz. Jayadev Vihar Square, Xavier Square, Rail Sadan, District Centre, Damana Square, Patia Square and KIIT Square (excluding Architectural finishing) from Chainage 7747.00 to 15017.00 of Bhubaneswar Metro Phase-I MRTS
Package BBC-05
Estimated Cost: Rs. 869.71 Crore
DMRC’s Brief Scope: Part Design and Construction of Elevated Viaduct and Six Elevated Stations viz. Nandan Vihar, Raghunathpur, Nandankanan Zoological Park, Barang Station, Phulapokhari, Trisulia Square (excluding Architectural finishing) from Chainage 15017.00m to 25987.78m and including ramp for Depot entry of Bhubaneswar Metro Phase-I MRTS
Bidders
- Ashoka Buildcon Ltd. (ABL)
- Ceigall India Ltd. (CIL)
- Dilip Buildcon Ltd. (DBL)
- Dineshchandra R.Agrawal Infracon Pvt. Ltd. (DRAIPL)
- GR Infraprojects Ltd. (GRIL)
- H.G. Infra Engineering Ltd. (HGIEL)
- Kalpataru Projects International Ltd. (KPIL)
- KEC International Ltd.
- NCC Ltd.
- Rail Vikas Nigam Ltd. (RVNL)
- Ranjit Buildcon Ltd. (RBL) – Package BBC-04 only
5th July 2024: https://themetrorailguy.com/2024/07/05/1...-contract/
12 Bidders for Bhubaneswar Metro Package BBC-03’s Contract
DMRC’s Brief Scope: Part Design and Construction of Elevated Viaduct and Six Elevated Stations viz. Capital Hospital, Bapuji Nagar, Bhubaneswar Railway Station, Ram Mandir Square, Vani Vihar and Acharya Vihar Square (excluding Architectural finishing ) from Chainage 625.00 m to 7747.00 m of Bhubaneswar Metro Phase-I MRTS.
Bidders
- Ashoka Buildcon Ltd. (ABL)
- Ceigall India Ltd. (CIL)
- Dilip Buildcon Ltd. (DBL)
- Dineshchandra R.Agrawal Infracon Pvt. Ltd. (DRAIPL)
- GR Infraprojects Ltd. (GRIL)
- H.G. Infra Engineering Ltd. (HGIEL)
- Kalpataru Projects International Ltd. (KPIL)
- KEC International Ltd.
- NCC Ltd.
- Rail Vikas Nigam Ltd. (RVNL)
- Ranjit Buildcon Ltd. (RBL)
- Tata Projects Ltd. (TPL)