Latest updates from https://themetrorailguy.com/category/bhubaneswar-metro/ .
9th August 2024: Excerpt from https://themetrorailguy.com/2024/08/09/r...-contract/
7th August 2024: Excerpt from https://themetrorailguy.com/2024/08/07/r...-contract/
5th August 2024: Excerpt from https://themetrorailguy.com/2024/08/05/c...-contract/
28th July 2024: Excerpt from https://themetrorailguy.com/2024/08/05/c...-contract/
9th August 2024: Excerpt from https://themetrorailguy.com/2024/08/09/r...-contract/
Quote:Ranjit Buildcon Ltd. (RBL) on Thursday was awarded a Rs. 561.21 crore contract to construct Package BBC-03 of Bhubaneswar Metro’s Phase 1 project ...
7.122 km long Package BBC-03 ... will connect Capital Hospital to Acharya Vihar Square via 6 elevated stations at Capital Hospital, Bapuji Nagar, Bhubaneswar Railway Station, Ram Mandir Square, Vani Vihar and Acharya Vihar Square.
7th August 2024: Excerpt from https://themetrorailguy.com/2024/08/07/r...-contract/
Quote:Ranjit Buildcon Ltd. (RBL) was today declared as the lowest bidder to construct Package BBC-04 of Bhubaneswar Metro’s Phase 1 project ...
7.27 km long Package BBC-04, ... will link Acharya Square and KIIT Square via 7 elevated stations at Jayadev Vihar Square, Xavier Square, Rail Sadan, District Centre, Damana Square, Patia Square and KIIT Square.
... Ranjit Buildcon Ltd. (RBL) 625.62 crores.
5th August 2024: Excerpt from https://themetrorailguy.com/2024/08/05/c...-contract/
Quote:Ceigall India Ltd. (CIL) was today declared as the lowest bidder to construct Package BBC-05 of Bhubaneswar Metro’s Phase 1 project
10.97 km Package BBC-05 ... links KIIT Square and Trisulia Square via 6 elevated stations at Nandan Vihar, Raghunathpur, Nandankanan Zoological Park, Barang Station, Phulapokhari, Trisulia Square.
Its scope also includes a ramp leading to Phulapokhari Depot & Workshop which will be built by M I A Construction under Package BBC-02 on a 16 hectare parcel.
... Ceigall India Ltd. (CIL) 899.00 crores
28th July 2024: Excerpt from https://themetrorailguy.com/2024/08/05/c...-contract/
Quote:August 2, 2024 Update: DMRC has issued LOA to Intercontinental Consultants and Technocrats Pvt. Ltd. (ICT) with a contract value of Rs. 13,04,19,000 (13.04 crore)
July 28, 2024 Original Post: Intercontinental Consultants and Technocrats Pvt. Ltd. (ICT) on Wednesday was declared as the lowest bidder for Bhubaneswar Metro Phase 1 project’s Detailed Design Consultant (DDC) contract BCDD-02 by Delhi Metro Rail Corporation (DMRC).
The scope of this contract for 26.04 km Bhubaneswar Metro Line-1 (Biju Patnaik Airport – Trisulia Square) includes two parts. The first pertains to Phulapokhari Depot and its Operational Control Centre (OCC)’s architectural, electrical & mechanical (E&M), traction and civil works. This facility for initially stabling and maintaining 13 trains (39 coaches) will be built by M I A Construction under Package BBC-02.
The second part involves proof checking Line-1’s substructure (viaduct), special span (location unknown to me, but likely over Indian Railways’ line on Barang Road), stations, and 750V DC traction & power supply works.