Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
State: Berhampur-Jeypore Expressway (High-speed corridor) - Biju Expressway 2
#1
Following is an excerpt from https://sambadenglish.com/latest-news/be...e_vignette


Quote:Berhampur-Jeypore highspeed corridor to connect towns and industries better: Minister

During a review meeting on the Berhampur-Jeypore highspeed corridor, Law Minister Prithiviraj Harichandan emphasised to connect the major towns, mining and industrial areas with the corridor

The proposed 217-km-long highspeed corridor will pass through Ganjam, Gajapati, Rayagada and Koraput districts.

Official sources said vehicles will travel at a maximum speed of 120 km per hour on this corridor. Four tunnels have been proposed for construction on this route. The travel time between  Berhampur to Jeypore will reduce to three hours from the present duration of seven hours, the official sources added.


It seems like a state government project. 

It was initially brought up as Biju Expressway 2. Following is an excerpt from https://www.constructionweekonline.in/pr...rs-7000-cr


Quote:The Odisha government has taken up the Phase-II part of the Biju Expressway-1 project, which involves an investment of Rs 7,000 crore.

The project is crucial for the economic and social development of the state. This new greenfield project is 305 km long and will connect Berhampur city with Jeypore, passing through 15 blocks in 4 districts, including 43 km in Ganjam, 47 km in Gajapati, 158 km in Rayagada, and 57 km in Koraput. The road will reduce the travel time from Berhampur to Jeypore from 8 hours to 5 hours.

Additionally, it will take only 45 minutes to reach Mohana from Berhampur and 1.30 hours to reach Mohana from Rayagada, reducing the current travel time of 4 hours.

For the first time in the state, the project will excavate hills and construct a tunnel, which will shorten the road length by 25 to 30 km and further reduce the travel time to less than 2 hours. The project is expected to be completed within three years and will create a new economic corridor in South Odisha.

The Phase-II project comes after the successful completion of the construction work of Biju Expressway-1.
Reply


Messages In This Thread
State: Berhampur-Jeypore Expressway (High-speed corridor) - Biju Expressway 2 - by Chitta - 11-09-2024, 11:46 PM

Forum Jump:


Users browsing this thread: 3 Guest(s)