The map at https://indiarailinfo.com/atlas gives good status information on doubling/tripling/etc.
Following is an excerpt from https://pib.gov.in/PressReleasePage.aspx?PRID=2111396
Until 10 years back there used to be only a single line between Nergundi and Cuttack. Its doubling was completed after 2014. In 2023 its tripling was approved. See https://www.constructionworld.in/transpo...ram-/43487 . Now the goal is to make it a quadruple line. Wow!
Following is an excerpt from https://pib.gov.in/PressReleasePage.aspx?PRID=2111396
Quote:89th Meeting of Network Planning Group under PM GatiShakti evaluates key infrastructure projects
NPG evaluates Road, Railway and Metro projects
Posted On: 14 MAR 2025 5:04PM by PIB Delhi
The 89th meeting of the Network Planning Group (NPG), chaired by Joint Secretary, Department for Promotion of Industry and Internal Trade (DPIIT) Shri Pankaj Kumar, convened today to evaluate infrastructure projects in the Road, Railway, and Metro sectors. The meeting focused on enhancing multimodal connectivity and logistics efficiency in alignment with the PM GatiShakti National Master Plan (PMGS NMP).
The NPG evaluated eight projects (four Road, three Railway, and one Metro) for their conformity to the PM GatiShakti principles of integrated multimodal infrastructure, last-mile connectivity to economic and social nodes, and intermodal coordination. These initiatives are expected to boost logistical efficiency, reduce travel times, and deliver significant socio-economic benefits across regions.
...
Ministry of Railways (MoR)
Construction of the fourth line from Nergundi to Cuttack with a flyover at Nergundi
The 15.99 km-long brownfield railway infrastructure project in Odisha aims to decongest existing rail lines, facilitate freight movement, and ensure smoother operations along a key corridor serving Paradip Port, Talcher coalfields, and major steel and power industries.
Construction of a doubling line from Haridaspur to Paradip
The 74.09 km-long brownfield project in Odisha will enhance freight transportation capacity and logistics efficiency, facilitating seamless coal transportation from Talcher Coalfields to Paradip Port while supporting industrial expansion in the Angul-Jharsuguda cluster.
...
These infrastructure projects, aligned with the PM GatiShakti National Master Plan, will significantly enhance connectivity, improve logistics, and contribute to regional and national economic growth.
***
Abhishek Dayal/ Abhijith Narayanan/ Ishita Biswas
(Release ID: 2111396) Visitor Counter : 1678
Read this release in: Odia , Urdu , Hindi , Marathi , Bengali , Bengali-TR , Gujarati , Tamil
Until 10 years back there used to be only a single line between Nergundi and Cuttack. Its doubling was completed after 2014. In 2023 its tripling was approved. See https://www.constructionworld.in/transpo...ram-/43487 . Now the goal is to make it a quadruple line. Wow!