Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Third and 4th lines
#4
Following is from https://pib.gov.in/PressReleasePage.aspx?PRID=2118724


Quote:Ministry of Railways

azadi ka amrit mahotsav

Cabinet approves four multitracking projects across Indian Railways

To enhance line capacity, Indian Railways plans to undertake four multitracking projects aimed to ensure seamless and faster transportation of both passengers and goods; These initiatives will improve travel convenience, reduce logistic cost, decrease oil imports and contribute to lower CO2 emissions, supporting sustainable and efficient rail operations

The projects aim to enhance logistical efficiency by increasing the line capacity along the key routes for coal, iron ore, and other minerals; These improvements will streamline the supply chains, thereby contributing to accelerated economic growth

The total estimated cost of the projects is Rs.18,658 crore and will be completed upto 2030-31

The projects will also generate direct employment for about 379 lakh human-days during construction

Posted On: 04 APR 2025 3:03PM by PIB Delhi

The Cabinet Committee on Economic Affairs, chaired by the Prime Minister Shri Narendra Modi, has approved Four projects of Ministry of Railways with total cost of Rs. 18,658 crore (approx.). The Four projects covering 15 Districts in 3 States i.e., Maharashtra, Odisha, and Chhattisgarh will increase the existing network of Indian Railways by about 1247 Kms.

These projects include:

Sambalpur – Jarapda 3rd and 4th Line                           
Jharsuguda – Sason 3rd and 4th Line                     
Kharsia – Naya Raipur – Parmalkasa 5th and 6th Line   
Gondia – Balharshah doubling
 
The enhanced line capacity will improve mobility, providing enhanced efficiency and service reliability for Indian Railways. These multi-tracking proposals will ease operations and reduce congestion, providing the much-required infrastructural development on the busiest sections across Indian Railways. The projects are in line with the Prime Minister Shri Narendra Modiji’s Vision of a New India which will make people of the region “Atmanirbhar” by way of comprehensive development in the area which will enhance their employment/ self-employment opportunities.

The projects are result of PM-Gati Shakti National Master Plan for multi-modal connectivity which have been possible through integrated planning and will provide seamless connectivity for movement of people, goods and services.

With these projects 19 New Stations will be constructed, enhancing connectivity to Two Aspirational Districts (Gadchiroli and Rajnandgaon). Multi-tracking project will enhance connectivity to approx. 3350 villages and about 47.25 lakh population.

Kharsia – Naya Raipur – Parmalkasa will provide direct connectivity to new areas such as Baloda Bazar, this will create possibilities for setting up of new industrial units including cement plants in the region.

These are essential routes for transportation of commodities such as agriculture products, fertilizer, coal, iron ore, steel, cement, limestone etc. The capacity augmentation works will result in additional freight traffic of magnitude 88.77 MTPA (Million Tonnes Per Annum). The Railways being environment friendly and energy efficient mode of transportation, will help both in achieving climate goals and minimizing logistics cost of the country, reduce oil import (95 Crore Litres) and lower CO2 emissions (477 Crore Kg) which is equivalent to plantation of 19 Crore trees.

***

MJPS/SKS


(Release ID: 2118724) Visitor Counter : 445
Reply


Messages In This Thread
Third and 4th lines - by Chitta - 08-17-2023, 02:32 AM
RE: Third lines - by Chitta - 12-13-2024, 06:05 PM
RE: Third lines - by Chitta - 03-16-2025, 07:01 PM
RE: Third and 4th lines - by Chitta - Yesterday, 06:12 PM
RE: Third and 4th lines - by Chitta - Yesterday, 06:13 PM

Forum Jump:


Users browsing this thread: 1 Guest(s)