Raipur-Vizag Expressway
|
Posts: 1,472
Threads: 762
Joined: Dec 2020
Reputation:
1
Following is excerpted from https://themetrorailguy.com/nhai-raipur-...ap-status/ .
Quote:Raipur – Visakhapatnam Economic Corridor – Information & Status Update
464 km Raipur – Visakhapatnam Economic Corridor (NH-130CD & EC-15), also known as Raipur – Vizag Expressway, is an approved 6 lane access-controlled road by NHAI with a route alignment through Chhattisgarh, Odisha and Andhra Pradesh.
Construction of this greenfield corridor will be financed by the Asian Development Bank (ADB) under Bharatmala Pariyojana Phase-I program with a primary goal to improve the efficiency of freight movement and boost exports.
Posts: 1,472
Threads: 762
Joined: Dec 2020
Reputation:
1
Posts: 1,472
Threads: 762
Joined: Dec 2020
Reputation:
1
04-23-2023, 06:55 PM
(This post was last modified: 04-23-2023, 06:56 PM by Chitta.)
Following is from https://themetrorailguy.com/nhai-raipur-...ap-status/
[font="Helvetica Neue", Helvetica, Arial, sans-serif]Raipur – Visakhapatnam Economic Corridor – Information & Status Update[/font]
464 km Raipur – Visakhapatnam Economic Corridor (NH-130CD & EC-15), also known as Raipur – Vizag Expressway, is an approved 6 lane access-controlled road by NHAI with a route alignment through Chhattisgarh, Odisha and Andhra Pradesh.
Construction of this greenfield corridor will be financed by the Asian Development Bank (ADB) under Bharatmala Pariyojana Phase-I program with a primary goal to improve the efficiency of freight movement and boost exports.
YONGMA Engineering Co. Ltd. – Arkitechno Consultants was appointed as the agency to prepare its Detailed Project Report (DPR).- Total Estimated Cost: Rs. 20,000 crore
- Project’s Total Length: 464.662 km
- Lanes: 6
- Deadline: 2025
- Owner: National Highways Authority of India (NHAI)
- Project Model: Hybrid Annuity Mode (HAM)
When ready, the distance from Raipur to Vizag will reduce from 590 km to 464 km and reduce travel time from 14 hours to about 7 hours.
[font="Helvetica Neue", Helvetica, Arial, sans-serif]Current Status[/font]
Tendering is underway for the expressway’s construction. Detailed Project Report (DPR) for a majority of the project has been completed and acquisition of land, forest and environment clearance are in different stages of approval.
[font="Helvetica Neue", Helvetica, Arial, sans-serif]Route Map[/font]
The Raipur – Vizag Economic Corridor project starts from Abhanpur near Raipur (Chhattisgarh) and ends at Sabbavaram near Vizag (Andhra Pradesh). The highway’s greenfield alignment will pass through the states of Chhattisgarh (124.611 km), Odisha (262.211 km) and Andhra Pradesh (99.629 km).
The following not-so-pretty map from the government’s environment clearance site displays its route:
[font="Helvetica Neue", Helvetica, Arial, sans-serif]Tenders & Contractors[/font]
The project has been divided into 19 civil packages with a 4 year deadline. Here’s a list of them north to south:
Package
Contractor
CG1: Abhanpur to Magerlod (km 00.000 to km 42.852)
Shalimar Corp
CG2: Sargi to Basanwahi (km 42.800 to km 99.500)
Dilip Buildcon Ltd. is lowest bidder
CG3: Basanwahi to Marangpuri (km 99.500 to km 124.661)
KMV Projects is lowest bidder
OD1: Dhanara (Odisha/Chhattisgarh Border) to Hatibena (km 124.611 to km 146.500)
NKC Projects is lowest bidder
OD2: Hatibena to Badakumari (km 146.500 to km 179.000)
Barbrik is lowest bidder
OD3: Badakumari to Karki (km 179.000 to km 226.500)
Adani Transport is lowest bidder
OD4: Karki to Kaliagura (km 226.500 to km 249.000)
NKC Projects is lowest bidder
OD5: Boriguma to Dasamantpur (km 249.000 to km 293.000)
HG Infra Engineering is lowest bidder at Rs. 1338.27 cr
OD6: Koraput to Pattangi (km 293.000 to km 338.500)
HG Infra Engineering is lowest bidder at Rs. 958.98 cr
OD7: Baraja to Kandili
DRA Infracon is lowest bidder
OD8: Kandili to Tumbigura
Max Infra (India) is lowest bidder
OD9: Scope Unknown
Tender Notice Pending
OD10: Scope Unknown
Tender Notice Pending
OD11: Scope Unknown
Tender Notice Pending
AP Package 1: Aluru to Jakkuva (km 365.033 to km 396.800)
HG Infra is lowest bidder
AP Package 2: Jakkuva to Korlam (km 396.800 to km 421.100)
NKC Projects is lowest bidder
AP Package 3: Korlam to Kantakapalle (km 421.100 to km 445.100)
PSK Infrastructures and Projects is lowest bidder
AP Package 4: Kantakapalle to Sabbavaram (km 445.100 to km 464.662)
NKC Projects is lowest bidder