Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Overall
#1
Following is an excerpt from https://sambadenglish.com/latest-news/wo...ha-6923015


Quote:Odisha to build 15,000 kms long road in 5 years
The Odisha government will construct 15,000 kms long high-quality road in next five years, in a bid to improve the road infrastructure further

Surya Narayan Pradhan
Updated 24 Aug 2024 21:07 IST

Bhubaneswar: The Odisha government will construct 15,000 kms long high-quality road in next five years ...

The Minister said Rs 236.30 Crore budgetary provision has been made for the Capital Road Development Programme in financial year 2024-25. Development of 20 kms long road will be taken up under the programme.

Work on the stretches of Kelucharna Park-Patia, Patia-Pahala, construction of a four-lane road through Sainik School, Patharagaida-Raghunathpur, a ring road from Patharagadia, development of Daya West Canal road, the Bhubaneswar Outer Ring road, Construction of flyovers at Mausimaa Chhak and Kalpana Chhak will be carried out.
Reply
#2


Discusses lots of plans.

  • Elevated corridor from Jayadev Vihar to Nandan Kanan
  • Three ring roads around Bhubaneswar. (Rameswar-Tangi, 142 kms Outer ring road, inner ring road)
  • Left parallel and Right parallel roads to Jayadev Vihar - Nandankanan to be completed
  • Elevated corridor to address Kalpana Square
  • Underground road at AG square
  • Patia - Barimunda - Near Phulnakhara
  • Puri NH and NH 16 cross connection
Reply
#3
More details from various media:

From https://newsonprojects.com/news/state-go...hubaneswar


Quote:a proposed 64-km inner ring road for Bhubaneswar, featuring a six-lane road connecting Tamando to Paikarapur and Dhauli to Tamando,

a 148-km outer ring road project, estimated at a cost of Rs. 6,152 crore.

completed road between Damana Square and Press Square 

the under-construction road between Sundarpada and Jatni.

grand peripheral ring road, with its first phase covering 287 km from Berhampur to Jeypore, including four tunnels.


From https://www.constructionworld.in/transpo...tion/68493

Quote:elevated approach and exit road at Bhubaneswar Railway Station’s Master Canteen side..

An elevated corridor from Jayadev Vihar to Nandankanan Zoo to ease congestion.

Road expansion along Daya West Canal Road from Patia Station Square to Suanga Mouza.

New flyovers at Kalpana Square, Museum Square, and Sishu Bhawan Square, along with an underpass at AG Square


From  https://www.etvbharat.com/en/!state/gran...5020101985

Quote:left parallel road from Institute of Mathematics through Patharagadia, Utkal Hospital, Rail Vihar to Ekamra Kanan.

connecting Damana square with Press square, Kalarahanga with Barimunda, and Kelucharan Park with Barimunda.

Grand Ring Road To Connect Four Corners Of Odisha

In another major infrastructure push, the government has planned to construct a Grand Ring Road connecting all four corners of the state. In the initial phase, a 287-km long road will be built from Berhampur to Jeypore, featuring tunnels in between.

From https://www.odisha.plus/2025/02/road-to-...ubaneswar/

Quote:A 64-kilometer inner ring road is set to be developed, featuring six-lane highways extending from Tamando to Paikrapur and from Dhauli to Tamando.

an outer ring road has been formulated to accommodate the city’s growth, comprising a 148-kilometer ring road with six lanes and two service roads. The estimated cost for the city expansion initiative is approximately Rs 6152 crore.
Reply
#4
Following map is from https://cms.bhubaneswarone.in/uploadDocu...etwork.pdf

[Image: attachment.php?aid=913]


Attached Files Thumbnail(s)
   

.pdf   6.2_Proposed_Road_Network.pdf (Size: 1.61 MB / Downloads: 5)
Reply


Forum Jump:


Users browsing this thread: 1 Guest(s)