Metro Rail for Bhubaneswar - tenders, contracts etc,
#21
Bhubaneswar metro will connect to the Baramunda Bus station in a later phase.

Quote:The terminal will see the next level of transformation Bhubaneswar Metro is planned to be connected to the Babasaheb Bhimrao Ambedkar Bus Terminal.

“The next level of transformation would be when Bhubaneswar Metro lands in BSBAT connecting Airport, Railway Station, Info City and Trisulia. With HCM’s commitment this dream will also come true taking Bhubaneswar towards a world-class metropolitan town,” he added.

Earlier in https://odishadev.odishasociety.org/thre...tml#pid913 we mentioned that a spur from Jayadev Vihar to AIIMS square via Baramunda bus terminal is in the plans. This will be 10 kms. Also there is plan to take the metro beyond Trisulia across Mahanadi  over a new bridge to Netaji bus station in Cuttack. This will be 7 kms.

The Jayadev Vihar-Baramunda - AIIMS square spur is imagined below.

[Image: attachment.php?aid=484]

The following imagines the connection to Netaji bus terminal and then to Cuttack railway station via SCB and Ravenshaw.  I also imagine another spur via Barabati stadium to SCB making a small loop. 

[Image: attachment.php?aid=483]


Attached Files Thumbnail(s)
       
Reply
#22
Sky blue: Current plan
Red: Next phase
Blue: My imagination

[Image: attachment.php?aid=485]


Attached Files Thumbnail(s)
   
Reply
#23
As per https://www.prameyanews.com/market-compl...swar-metro market complexes are being planned at each of the 20 metro stations.
Reply
#24
Various news items report that MIA wins the contract for Phulpokhari depot at "79.75 crore, well below DMRC’s estimate of Rs. 104.74 crore" .  Reference: https://themetrorailguy.com/2024/06/09/m...ct-bbc-02/ 
See also https://www.metrorailnews.in/bhubaneswar...-contract/
Reply
#25
It is great that the new government plans to take central assistance for the metro. https://odishabytes.com/odisha-govt-to-a...-minister/ Most of the other metros in the country have received central assistance, so forgoing that did not make sense. Taking the central assistance we can quickly work on the extensions of the metro in both directions: Cuttack, and Baramunda Bus terminal. Earlier we gave couple of extension proposals. The following two maps build up on them.

[Image: attachment.php?aid=534]

In the above the metro line may be too close to the airplane path; so the following may be a better alternative.

[Image: attachment.php?aid=535]

We have twitted about these at https://x.com/Odishalinks/status/1805658518533587415 and have tagged 
@AshwiniVaishnaw
@AprajitaSarangi
@PandaJay
@MohanMOdisha
@SamalManmohan7
@KVSinghDeo1
@PravatiPOdisha
@CMO_Odisha
@kanak_news
@otvnews
@tanaya_p
@SatpathyLive
@SoumyaSambad
@OdishaRail


Attached Files Thumbnail(s)
       
Reply
#26
6/26/2024: The Bhubaneswar Metro now has an official website: https://www.bhubaneswarmetro.in/
Reply
#27
Following is from https://www.prameyanews.com/dmrc-floats-...swar-metro


Quote:DMRC floats tender out for 39 metro rail coaches for Bhubaneswar metro

Prameyanews English
Published By : Prameya News Bureau | July 20, 2024 IST

Bhubaneswar, July 20: The Delhi Metro Rail Corporation (DMRC) has floated tenders for procurement of 39 coaches at Rs 509.68 crore for the Bhubaneswar metro rail project.

According to sources, 13 trains each comprising three coaches will run between Biju Patnaik International Airport and Trisulia in the first phase.

The tender was floated on July 18 and the bids will open on September 2. A pre-bid meeting in this regard is scheduled to take place on August 2.

The contract period will be three years in which the prototype will be delivered within two years, while the remaining 12 set of coaches will be delivered in phases in another one year, sources said.

Former Odisha Chief Minister Naveen Patnaik had laid the foundation stone for the proposed metro project at Trisulia on January 1 this year.

Odisha government has roped in DMRC for the project with a deadline of four years. Rs 6,255 crore will be invested for the Bhubaneswar Metro Rail Corporation (BMRC) in the first phase.
Reply
#28
Recent updates from https://themetrorailguy.com/category/bhubaneswar-metro/ . It has a lot more details.

16th July 2024https://themetrorailguy.com/2024/07/16/s...t-bcdd-01/ 
SYSTRA Wins Bhubaneswar Metro’s Detailed Design Consultant Contract BCDD-01

10th July 2024: https://themetrorailguy.com/2024/07/10/1...04-bbc-05/
11 Bidders for Bhubaneswar Metro’s Contracts BBC-04 & BBC-05

Package BBC-04
Estimated Cost: Rs. 664.06 Crore
DMRC’s Brief Scope: Part Design and Construction of Elevated Viaduct and Seven Elevated Stations viz. Jayadev Vihar Square, Xavier Square, Rail Sadan, District Centre, Damana Square, Patia Square and KIIT Square (excluding Architectural finishing) from Chainage 7747.00 to 15017.00 of Bhubaneswar Metro Phase-I MRTS

Package BBC-05
Estimated Cost: Rs. 869.71 Crore
DMRC’s Brief Scope: Part Design and Construction of Elevated Viaduct and Six Elevated Stations viz. Nandan Vihar, Raghunathpur, Nandankanan Zoological Park, Barang Station, Phulapokhari, Trisulia Square (excluding Architectural finishing) from Chainage 15017.00m to 25987.78m and including ramp for Depot entry of Bhubaneswar Metro Phase-I MRTS

Bidders
  1. Ashoka Buildcon Ltd. (ABL)
  2. Ceigall India Ltd. (CIL)
  3. Dilip Buildcon Ltd. (DBL)
  4. Dineshchandra R.Agrawal Infracon Pvt. Ltd. (DRAIPL)
  5. GR Infraprojects Ltd. (GRIL)
  6. H.G. Infra Engineering Ltd. (HGIEL)
  7. Kalpataru Projects International Ltd. (KPIL)
  8. KEC International Ltd.
  9. NCC Ltd.
  10. Rail Vikas Nigam Ltd. (RVNL)
  11. Ranjit Buildcon Ltd. (RBL) – Package BBC-04 only

5th July 2024: https://themetrorailguy.com/2024/07/05/1...-contract/
12 Bidders for Bhubaneswar Metro Package BBC-03’s Contract
DMRC’s Brief Scope: Part Design and Construction of Elevated Viaduct and Six Elevated Stations viz. Capital Hospital, Bapuji Nagar, Bhubaneswar Railway Station, Ram Mandir Square, Vani Vihar and Acharya Vihar Square (excluding Architectural finishing ) from Chainage 625.00 m to 7747.00 m of Bhubaneswar Metro Phase-I MRTS.

Bidders
  1. Ashoka Buildcon Ltd. (ABL)
  2. Ceigall India Ltd. (CIL)
  3. Dilip Buildcon Ltd. (DBL)
  4. Dineshchandra R.Agrawal Infracon Pvt. Ltd. (DRAIPL)
  5. GR Infraprojects Ltd. (GRIL)
  6. H.G. Infra Engineering Ltd. (HGIEL)
  7. Kalpataru Projects International Ltd. (KPIL)
  8. KEC International Ltd.
  9. NCC Ltd.
  10. Rail Vikas Nigam Ltd. (RVNL)
  11. Ranjit Buildcon Ltd. (RBL)
  12. Tata Projects Ltd. (TPL)
Reply
#29
Latest updates from https://themetrorailguy.com/category/bhubaneswar-metro/ .

9th August 2024: Excerpt from https://themetrorailguy.com/2024/08/09/r...-contract/ 


Quote:Ranjit Buildcon Ltd. (RBL) on Thursday was awarded a Rs. 561.21 crore contract to construct Package BBC-03 of Bhubaneswar Metro’s Phase 1 project ... 

7.122 km long Package BBC-03 ... will connect Capital Hospital to Acharya Vihar Square via 6 elevated stations at Capital Hospital, Bapuji Nagar, Bhubaneswar Railway Station, Ram Mandir Square, Vani Vihar and Acharya Vihar Square.


7th August 2024: Excerpt from https://themetrorailguy.com/2024/08/07/r...-contract/ 


Quote:Ranjit Buildcon Ltd. (RBL) was today declared as the lowest bidder to construct Package BBC-04 of Bhubaneswar Metro’s Phase 1 project ...

7.27 km long Package BBC-04, ... will link Acharya Square and KIIT Square via 7 elevated stations at  Jayadev Vihar Square, Xavier Square, Rail Sadan, District Centre, Damana Square, Patia Square and KIIT Square.

... Ranjit Buildcon Ltd. (RBL) 625.62 crores.



5th August 2024: Excerpt from https://themetrorailguy.com/2024/08/05/c...-contract/ 


Quote:Ceigall India Ltd. (CIL) was today declared as the lowest bidder to construct Package BBC-05 of Bhubaneswar Metro’s Phase 1 project 

10.97 km Package BBC-05 ... links KIIT Square and Trisulia Square via 6 elevated stations at Nandan Vihar, Raghunathpur, Nandankanan Zoological Park, Barang Station, Phulapokhari, Trisulia Square.

Its scope also includes a ramp leading to Phulapokhari Depot & Workshop which will be built by M I A Construction under Package BBC-02 on a 16 hectare parcel.

... Ceigall India Ltd. (CIL) 899.00 crores


28th July 2024: Excerpt from https://themetrorailguy.com/2024/08/05/c...-contract/ 


Quote:August 2, 2024 Update: DMRC has issued LOA to Intercontinental Consultants and Technocrats Pvt. Ltd. (ICT) with a contract value of Rs. 13,04,19,000 (13.04 crore)

July 28, 2024 Original Post: Intercontinental Consultants and Technocrats Pvt. Ltd. (ICT) on Wednesday was declared as the lowest bidder for Bhubaneswar Metro Phase 1 project’s Detailed Design Consultant (DDC) contract BCDD-02 by Delhi Metro Rail Corporation (DMRC).

The scope of this contract for 26.04 km Bhubaneswar Metro Line-1 (Biju Patnaik Airport – Trisulia Square) includes two parts. The first pertains to Phulapokhari Depot and its Operational Control Centre (OCC)’s architectural, electrical & mechanical (E&M), traction and civil works. This facility for initially stabling and maintaining 13 trains (39 coaches) will be built by M I A Construction under Package BBC-02.

The second part involves proof checking Line-1’s substructure (viaduct), special span (location unknown to me, but likely over Indian Railways’ line on Barang Road), stations, and 750V DC traction & power supply works.
Reply