Thread Rating:
0 Vote(s) - 0 Average
1
2
3
4
5
Overall Maps
Posts: 1,653
Threads: 813
Joined: Dec 2020
Reputation:
1
09-25-2024, 09:55 PM
(This post was last modified: 09-25-2024, 09:56 PM by Chitta .)
Attached Files
Thumbnail(s)
Posts: 1,653
Threads: 813
Joined: Dec 2020
Reputation:
1
03-11-2025, 11:28 PM
(This post was last modified: 03-11-2025, 11:48 PM by Chitta .)
Following is a screen copy from
https://www.youtube.com/watch?v=dFq_UyG4cQE
The skyblue lines are non-ECOR (SER, SECR, or SR) lines.
Green: new lines
Pink: Mineral corridor
Red:doubling/tripling/etc.
Ongoing projects list Odisha ECoR
Talcher-Bimlagarh 154 1928.07
KodingamaliBauxite Mines to Singaram Railway Station (9.40 Km) 9 190.9
GandhmardanIron Ore Mines to GoaldihStation 13 189.93
Brundamal-Jharsuguda-flyover connection for joining DN Line 7 296.51
Bhadrak-Nergundi3rd line (80 km) 92 1284.39
Jarapaada-Budhapank3rd & 4th line with flyover at Talcher. 101 810.02
Budhapank-Salegaonvia Rajatgarh3rd & 4th line 170 1172.92
Odisha Koraput-SingapurRd. 165 2361.74
Chhattisgarh Kirandul-Jadgalpur(150 km) 150 1440
Chhattisgarh,Odisha Jagdalpur-Koraput 107 2343.64
Andhra Pradesh, Odisha Vizianagram-Titlagarh(Sambalpur) 3rd line 265 4803.1618
Andhra Pradesh Odisha 3rd line between Nergundi-Barang& KhurdaRoad -Vizianagaram 385 4962.87
Andhra Pradesh, Odisha Kottavalasa-Koraput 189 2499.71
Energy Project Corridor ( in Km ) (in ₹ Cr)
E010 BargarhRoad-NawaparaRoad viaPadampur 138.32 2,622
E011 Inner Corridor Phase-II of Talcher coal field from Putagadia-Jarapadaalong with link from Putagadiato Tentuloi 54 972
E012 Outer Corridor of Talcher coal field from Tentulaito Budhapank 106 2,650
E014 New Line for 2 Bauxite Mines KutrumaliBauxite Mines, SijumaliBauxite Mines to TikiriRailway Station. 49 1,304
E015 Extension of existing Naupada-Gunupurline uptoTheruvali 74 1,166
E016 Junagarh-Nabarangpur 116.21 2,865
E017 Malkangiri-Bhadrachalam-Pandurangapuram 173.6 3,592
E018 Daitary station to Baliparbat iron ore mines 9 261
E019 Nayagarh station to Dubna iron ore mines 5 145
E020 Bolangir-Nawapara Road 100 2,900
E051 3rd & 4th line from Jharsuguda to Sambalpur Jn 51 1,836
E052 3rd & 4th line from Sambalpur City to Jarapada 180 6,480
E053 3rd (patch) and 4th line from Vizianagaram to Raipur 334.5 12,042
E054 3rd & 4th line from Jakhapuraand Nayagarh 168 6,048
E055 Talcher-Sukinda Doubling 90 1,620
E056 Cuttack -Badabandha(Paradeep) 3rd & 4th line 73.5 2,646
E126 Flyover at Khurda Road 7 370
E127 Flyover bypassing upstream traffic coming from RV line and merging with loop line at SingapurRoad 5 225
E128 Provision of flyover at Sarla from Sambalpur City end to connect the DN grid of Sarla to avoid surface crossing. 5 273
E129 4th line from Jakhapura-Haridaspur 24 432
E130 Paradeep –Badabandha 3rd and 4th line 18.51 300
E131 Inner Corridor Phase-I of Talcher coal field -AngulBalaram Doubling 14 252
E132 Flyover at Titlagarh 3 54
E133 Flyover at Rajathgarh-Machapur 10 180
E134 Flyover at Vizianagaram 7 126
E135 Ranital Jn Cabin -Bhadrak 10 180
E178 Kottavalasa-Ankapallibypassing Simhachalamand Duvvada. 35 700
Future Projects (Odisha)
E014 New Line for 2 Bauxite Mines Kutrumali Bauxite Mines, Sijumali Bauxite Mines to Tikiri Railway Station. 61 1,304
E018 Daitary station to Baliparbat iron ore mines 9 261 iron ore
E019 Nayagarh station to Dubna iron ore mines 5 145 iron ore
E051 3rd & 4th line from Jharsuguda to Sambalpur Jn 102 1,836
E052 3rd & 4th line from Sambalpur City to Jarapada 360 6,480
E053 3rd (patch) and 4th line from Vizianagaram to Raipur 669 12,042 coal & iron ore
E054 3rd & 4th line from Jakhapuraand Nayagarh 336 6,048 coal & iron ore
E055 Talcher-Sukinda Doubling 90 1,620 coal & iron ore
E128 Provision of flyover at Sarla from Sambalpur City end to connect the DN grid of Sarla to avoid surface crossing. 5 273 iron ore
E132 Flyover at Titlagarh 3 54 iron ore
Attached Files
Thumbnail(s)
Posts: 1,653
Threads: 813
Joined: Dec 2020
Reputation:
1
Posts: 1,653
Threads: 813
Joined: Dec 2020
Reputation:
1
Posted the following request at
https://indiarailinfo.com/blog/post/6657280
I love the Atlas in this site. This is my first blog post. So forgive me if I make some protocol mistake.
Following are some suggestions on updating the Atlas with ECOR new lines that have been approved. (I am not sure what level of approval merits the Atlas to be updated.)
1. Baragarh Road - Nuapada line: Some links regarding its status and approval are at click here A twit on this by PIB is at click here It also includes a video by the Rail Minister.
2. Bhadrachalam Rd - Malkangiri: Links at click here It has received cabinet approval. Land acquisition notice for this has been issued.
3. Malkangiri - Jeypore: Tenders for construction have been issued. Links at click here
4. Jeypore - Nabarangpur : Links at click here
5. Nabrangpur - Junagarh Rd: Has received cabinet approval. Links at click here
6. Gunupur - Theruvali: Has received cabinet approval. Links at click here
In addition the following two lines are mentioned in the 2025-26 ECOR consolidated budget.
A, Puri-Konark : Mentioned in page 73 of click here
B. Sambalpur - Gopalpur: Mentioned in page 85 of click here