Thread Rating:
- 0 Vote(s) - 0 Average
- 1
- 2
- 3
- 4
- 5
Overall Maps
|
Posts: 1,628
Threads: 808
Joined: Dec 2020
Reputation:
1
09-25-2024, 09:55 PM
(This post was last modified: 09-25-2024, 09:56 PM by Chitta.)
Posts: 1,628
Threads: 808
Joined: Dec 2020
Reputation:
1
03-11-2025, 11:28 PM
(This post was last modified: 03-11-2025, 11:48 PM by Chitta.)
Following is a screen copy from https://www.youtube.com/watch?v=dFq_UyG4cQE
- The skyblue lines are non-ECOR (SER, SECR, or SR) lines.
- Green: new lines
- Pink: Mineral corridor
- Red:doubling/tripling/etc.
Ongoing projects list Odisha ECoR
- Talcher-Bimlagarh 154 1928.07
- KodingamaliBauxite Mines to Singaram Railway Station (9.40 Km) 9 190.9
- GandhmardanIron Ore Mines to GoaldihStation 13 189.93
- Brundamal-Jharsuguda-flyover connection for joining DN Line 7 296.51
- Bhadrak-Nergundi3rd line (80 km) 92 1284.39
- Jarapaada-Budhapank3rd & 4th line with flyover at Talcher. 101 810.02
- Budhapank-Salegaonvia Rajatgarh3rd & 4th line 170 1172.92
- Odisha Koraput-SingapurRd. 165 2361.74
- Chhattisgarh Kirandul-Jadgalpur(150 km) 150 1440
- Chhattisgarh,Odisha Jagdalpur-Koraput 107 2343.64
- Andhra Pradesh, Odisha Vizianagram-Titlagarh(Sambalpur) 3rd line 265 4803.1618
- Andhra Pradesh Odisha 3rd line between Nergundi-Barang& KhurdaRoad -Vizianagaram 385 4962.87
- Andhra Pradesh, Odisha Kottavalasa-Koraput 189 2499.71
Energy Project Corridor ( in Km ) (in ₹ Cr)
- E010 BargarhRoad-NawaparaRoad viaPadampur 138.32 2,622
- E011 Inner Corridor Phase-II of Talcher coal field from Putagadia-Jarapadaalong with link from Putagadiato Tentuloi 54 972
- E012 Outer Corridor of Talcher coal field from Tentulaito Budhapank 106 2,650
- E014 New Line for 2 Bauxite Mines KutrumaliBauxite Mines, SijumaliBauxite Mines to TikiriRailway Station. 49 1,304
- E015 Extension of existing Naupada-Gunupurline uptoTheruvali 74 1,166
- E016 Junagarh-Nabarangpur 116.21 2,865
- E017 Malkangiri-Bhadrachalam-Pandurangapuram 173.6 3,592
- E018 Daitary station to Baliparbat iron ore mines 9 261
- E019 Nayagarh station to Dubna iron ore mines 5 145
- E020 Bolangir-Nawapara Road 100 2,900
- E051 3rd & 4th line from Jharsuguda to Sambalpur Jn 51 1,836
- E052 3rd & 4th line from Sambalpur City to Jarapada 180 6,480
- E053 3rd (patch) and 4th line from Vizianagaram to Raipur 334.5 12,042
- E054 3rd & 4th line from Jakhapuraand Nayagarh 168 6,048
- E055 Talcher-Sukinda Doubling 90 1,620
- E056 Cuttack -Badabandha(Paradeep) 3rd & 4th line 73.5 2,646
- E126 Flyover at Khurda Road 7 370
- E127 Flyover bypassing upstream traffic coming from RV line and merging with loop line at SingapurRoad 5 225
- E128 Provision of flyover at Sarla from Sambalpur City end to connect the DN grid of Sarla to avoid surface crossing. 5 273
- E129 4th line from Jakhapura-Haridaspur 24 432
- E130 Paradeep –Badabandha 3rd and 4th line 18.51 300
- E131 Inner Corridor Phase-I of Talcher coal field -AngulBalaram Doubling 14 252
- E132 Flyover at Titlagarh 3 54
- E133 Flyover at Rajathgarh-Machapur 10 180
- E134 Flyover at Vizianagaram 7 126
- E135 Ranital Jn Cabin -Bhadrak 10 180
- E178 Kottavalasa-Ankapallibypassing Simhachalamand Duvvada. 35 700
Future Projects (Odisha)
- E014 New Line for 2 Bauxite Mines Kutrumali Bauxite Mines, Sijumali Bauxite Mines to Tikiri Railway Station. 61 1,304
- E018 Daitary station to Baliparbat iron ore mines 9 261 iron ore
- E019 Nayagarh station to Dubna iron ore mines 5 145 iron ore
- E051 3rd & 4th line from Jharsuguda to Sambalpur Jn 102 1,836
- E052 3rd & 4th line from Sambalpur City to Jarapada 360 6,480
- E053 3rd (patch) and 4th line from Vizianagaram to Raipur 669 12,042 coal & iron ore
- E054 3rd & 4th line from Jakhapuraand Nayagarh 336 6,048 coal & iron ore
- E055 Talcher-Sukinda Doubling 90 1,620 coal & iron ore
- E128 Provision of flyover at Sarla from Sambalpur City end to connect the DN grid of Sarla to avoid surface crossing. 5 273 iron ore
- E132 Flyover at Titlagarh 3 54 iron ore
|
Users browsing this thread: 1 Guest(s)